Product Description
Carbon steel tube is made of steel ingot or solid tube blank perforated into wool tube, and then hot rolled, cold rolled or cold drawn. Carbon steel pipe plays an important role in our Steel Pipe industry. According to incomplete statistics, existing carbon steel tube manufacturers in our country about more than 240 enterprises, carbon steel tube units about more than 250 sets, annual capacity about more than 4.5 million tons.
Carbon steel pipes are divided into hot rolled and cold rolled (drawn) steel pipes.
Hot rolled carbon steel pipe is divided into general steel pipe, low and medium pressure Boiler Steel Pipe, high pressure boiler steel pipe, alloy steel pipe, Stainless Steel Pipe, petroleum cracking pipe, geological steel pipe and other steel pipe.
Cold rolled (dial) carbon steel pipe in addition to general steel pipe, low and medium pressure boiler steel pipe, high pressure boiler steel pipe, alloy steel pipe, Stainless Steel pipe, oil cracking pipe, other steel pipe, also includes carbon thin-wall steel pipe, alloy thin-wall steel pipe, stainless steel pipe, special-shaped steel pipe. The outer diameter of hot-rolled seamless pipe is generally greater than 32mm, and the wall thickness is 2.5-75mm. The outer diameter of cold-rolled Seamless Steel Pipe can be up to 6mm, and the wall thickness can be up to 0.25mm. The outer diameter of thin-walled pipe can be up to 5mm, and the wall thickness is less than 0.25mm.
Product Specification
Product | SEAMLESS / ERW / SAW ALLOY STEEL PIPE |
Dimension | 6 mm - 1080 mm |
Thickness | 1mm - 135 mm |
Length | 3 m - 12 m or according to the requirements of clients |
Standard | ASTM GB DIN |
Steel grade | A106/53/179/214/192/210 A/B/C ST37.2/35.4/35.8/52/52.3/52.4/42/45 10# 20# 45# P2, P12, P11, P22, P5, P9, P91 T2, T11,T5,T9,T22, 4140, 12CrMo, 15CrMo, 12Cr2Mo, 1Cr5Mo, 2CrMo4, 1Cr9Mo, 10CrMo910, etc. |
Trade terms | FOB/CIF/CFR |
Payment terms | T/T, L/C |
Delivery port | Tianjin, China |
Delivery time | 10 or according to the real quantity of the tubes |
Surface treatment | Black painting Varnish painting 3PE Hot galvanized or other coating according to your requirements Bare tube |
End of tubes | Beveled, plain, thread, plastic caps |
Inspection | Ultrasonic examination, eddy inspection, hydrosttic testing etc. |
Package | Bundles, lossen or according to your requirements |
Certificate | API 5L/5CT, ISO, PED etc. |
Technical data
Chemical Composition
C, % | Mn, % | P, % | S, % | Si, % | Cr, % | Mo, % |
0.05-0.15 | 0.30-0.60 | 0.025 max | 0.025 max | 0.50-1.00 | 1.00-1.50 | 0.44-0.65 |
Mechanical Properties
Tensile Strength, MPa | Yield Strength, MPa | Elongation, % |
415 min | 205 min | 30 min |
Outside Diameter & Tolerance
ASTM A450 | Hot rolled | Outside Diameter, mm | Tolerance, mm |
OD≤101.6 | +0.4/-0.8 |
101.6<OD≤190.5 | +0.4/-1.2 |
190.5<OD≤228.6 | +0.4/-1.6 |
Cold Drawn | Outside Diameter, mm | Tolerance, mm |
OD<25.4 | ±0.10 |
25.4≤OD≤38.1 | ±0.15 |
38.1<OD<50.8 | ±0.20 |
50.8≤OD<63.5 | ±0.25 |
63.5≤OD<76.2 | ±0.30 |
76.2≤OD≤101.6 | ±0.38 |
101.6<OD≤190.5 | +0.38/-0.64 |
190.5<OD≤228.6 | +0.38/-1.14 |
ASTM A530 & ASTM A335 | NPS | Outside Diameter, inch | Tolerance, mm |
1/8≤OD≤1-1/2 | ±0.40 |
1-1/2<OD≤4 | ±0.79 |
4<OD≤8 | +1.59/-0.79 |
8<OD≤12 | +2.38/-0.79 |
OD>12 | ±1% |
Wall thickness & Tolerance
ASTM A450 | Hot rolled | Outside Diameter, mm | Tolerance, % |
OD≤101.6, WT≤2.4 | +40/-0 |
OD≤101.6, 2.4<WT≤3.8 | +35/-0 |
OD≤101.6, 3.8<WT≤4.6 | +33/-0 |
OD≤101.6, WT>4.6 | +28/-0 |
OD>101.6, 2.4<WT≤3.8 | +35/-0 |
OD>101.6, 3.8<WT≤4.6 | +33/-0 |
OD>101.6, WT>4.6 | +28/-0 |
Cold Drawn | Outside Diameter, mm | Tolerance, % |
OD≤38.1 | +20/-0 |
OD>38.1 | +22/-0 |
ASTM A530 | NPS | Outside Diameter, inch | Tolerance, % |
1/8≤OD≤2-1/2 | +20.0/-12.5 |
3≤OD≤18, WT/OD≤5% | +22.5/-12.5 |
3≤OD≤18, WT/OD>5% | +15.0/-12.5 |
OD≥20, WT/OD≤5% | +22.5/-12.5 |
OD≥20, WT/OD>5% | +15.0/-12.5 |
Product Display
Packaging And Transportation
FAQ
1.Why you choose us ?
Our company has been 12 years. We control the quality of the products very strictly, there are special people for the quality.
If you got lower price from other supplier ,we will pay back twice to customers about the higher price.
2.How long is your delivery time?
According to the quantity.Generally within 2-7 days if in stock.And 15-20 days if not in stock.
3.What is your payment terms?
A: By T/T 30% in advance ,and 70% before delivery.
B:100% L/C at sight.
C:By T/T 30% in advance,and 70% L/C at sight.
4.Do you provide samples ? Is it free?
Yes, we offer the sample for free but do not pay for the cost of freight.
5.What if the customer is not satisfied?
If there is a problem with the product,we take full responsibility.
If there is a problem in the transportation process,we will help you to solve it.