Home> Products> Steel Pipe> Carbon steel pipe> S335 Carbon Steel Pipe

S335 Carbon Steel Pipe

S335 Carbon Steel Pipe
S335 Carbon Steel Pipe
S335 Carbon Steel Pipe
S335 Carbon Steel Pipe
  • Payment Type: T/T,L/C,D/P,D/A
  • Incoterm: FOB,CFR,CIF,EXW
  • Min. Order: 5 Ton
  • Transportation: Ocean,Land,Air,Express,Others
Share:
TEL: 86-18365966122 MOB:+8618365966122 Contact Us >
Product Detail Description
Product Attributes

Model No.ASTM a519 4140

BrandJianlong

StandardAisi, Astm, Jis, Bs, Din, Gb

Place Of OriginChina

Production ProcessHot Rolled, Cold Rolled

ApplicationBoiler Plate, Container Plate, Flange Plate, Ship Plate

Special SteelSilicon Steel, Wear Resistant Steel

Tolerance±1%, ±10%

CategoryCold Rolled Steel Sheet

Processing ServiceBending, Welding, Decoiling, Cutting, Punching

Outer Diameter:10 - 65 mm

Material:Carbon steel, Alloy

Length:12M, 6m, 6.4M

Tolerance:+/-0.05mm

Payment Term:L/C T/T (30% Deposit)

Grade:Q235, Q235B, S275, S275jr, A53, st37, etc

Packaging & Delivery
Selling Units: Ton
Package Type: Paper plastic waterproof or iron sheet covering or three straps binding
Picture Example:
Supply Ability & Additional Information

PackagingPaper plastic waterproof or iron sheet covering or three straps binding

Productivity10000 tons/month

TransportationOcean,Land,Air,Express,Others

Place of OriginCHINA

Supply Ability10000 tons/month

CertificateISO

HS Code73089000.00

Payment TypeT/T,L/C,D/P,D/A

IncotermFOB,CFR,CIF,EXW

Product Description


Product Description

The raw material of carbon steel tube is round tube billet, round tube embryo to be cut by cutting machine processing billet with growth of about 1 meter, and sent to the furnace by conveyor belt heating.  The billet is fed into a furnace and heated to about 1200 degrees Celsius.  The fuel is hydrogen or acetylene.  The temperature control in the furnace is the key problem.  After the round tube billet comes out, it is perforated by the pressure punch.  Generally, the most common perforator is the conical roll perforator. This kind of perforator has high production efficiency, good product quality, large perforating diameter and can wear a variety of steel.  After perforation, the round tube billet is successively rolled by three high diagonal, continuous rolling or extrusion.  After extrusion, the pipe should be removed for sizing.  The caliper rotates into the steel embryo through a conical drill at high speed to punch holes and form steel pipes.  The inner diameter of the Steel Pipe is determined by the outer diameter length of the caliper drill bit.  After sizing the steel pipe, it enters the cooling tower and is cooled by spraying water. After cooling the steel pipe, it will be straightened.  After straightening, the steel pipe is sent by conveyor belt to the metal inspection machine (or hydraulic test) for internal inspection.  If there are cracks, bubbles and other problems inside the steel pipe, it will be detected.  Steel pipe quality inspection after the strict hand selection.  After the steel pipe is inspected, the number, specification and production lot number are sprayed with paint.  And by the crane into the warehouse. 


Carbon steel tube is made of steel ingot or solid tube blank perforated into wool tube, and then hot rolled, cold rolled or cold drawn.  Carbon steel pipe plays an important role in our steel pipe industry.  According to incomplete statistics, existing carbon steel tube manufacturers in our country about more than 240 enterprises, carbon steel tube units about more than 250 sets, annual capacity about more than 4.5 million tons. 



Product Specification

Product SEAMLESS / ERW / SAW ALLOY STEEL PIPE
Dimension 6 mm - 1080 mm
Thickness 1mm - 135 mm
Length 3 m - 12 m or according to the requirements of clients
Standard ASTM GB DIN
Steel grade A106/53/179/214/192/210 A/B/C
ST37.2/35.4/35.8/52/52.3/52.4/42/45
10# 20# 45#
P2, P12, P11, P22, P5, P9, P91 
T2, T11,T5,T9,T22, 4140, 12CrMo, 15CrMo, 12Cr2Mo, 1Cr5Mo, 2CrMo4, 1Cr9Mo, 10CrMo910, etc.  
Trade terms FOB/CIF/CFR
Payment terms T/T, L/C
Delivery port Tianjin, China
Delivery time 10 or according to the real quantity of the tubes
Surface treatment Black painting
Varnish painting
3PE
Hot galvanized
or other coating according to your requirements
Bare tube
End of tubes Beveled, plain, thread, plastic caps
Inspection Ultrasonic examination, eddy inspection, hydrosttic testing etc.
Package Bundles, lossen or according to your requirements
Certificate API 5L/5CT, ISO, PED etc.

Technical data

Chemical  Composition

C, % Mn, % P, % S, % Si, % Cr, % Mo, %
0.05-0.15 0.30-0.60 0.025 max 0.025 max 0.50-1.00 1.00-1.50 0.44-0.65

 
Mechanical Properties

Tensile Strength, MPa Yield Strength, MPa Elongation, %
415 min 205 min 30 min

 
Outside Diameter & Tolerance

ASTM A450 Hot rolled Outside Diameter, mm Tolerance, mm
OD≤101.6 +0.4/-0.8
101.6<OD≤190.5 +0.4/-1.2
190.5<OD≤228.6 +0.4/-1.6
Cold Drawn Outside Diameter, mm Tolerance, mm
OD<25.4 ±0.10
25.4≤OD≤38.1 ±0.15
38.1<OD<50.8 ±0.20
50.8≤OD<63.5 ±0.25
63.5≤OD<76.2 ±0.30
76.2≤OD≤101.6 ±0.38
101.6<OD≤190.5 +0.38/-0.64
190.5<OD≤228.6 +0.38/-1.14
ASTM A530 & ASTM A335 NPS Outside Diameter, inch Tolerance, mm
1/8≤OD≤1-1/2 ±0.40
1-1/2<OD≤4 ±0.79
4<OD≤8 +1.59/-0.79
8<OD≤12 +2.38/-0.79
OD>12 ±1%

 
Wall thickness & Tolerance

ASTM A450 Hot rolled Outside Diameter, mm Tolerance, %
OD≤101.6, WT≤2.4 +40/-0
OD≤101.6, 2.4<WT≤3.8 +35/-0
OD≤101.6, 3.8<WT≤4.6 +33/-0
OD≤101.6, WT>4.6 +28/-0
OD>101.6, 2.4<WT≤3.8 +35/-0
OD>101.6, 3.8<WT≤4.6 +33/-0
OD>101.6, WT>4.6 +28/-0
Cold Drawn Outside Diameter, mm Tolerance, %
OD≤38.1 +20/-0
OD>38.1 +22/-0
ASTM A530 NPS Outside Diameter, inch Tolerance, %
1/8≤OD≤2-1/2 +20.0/-12.5
3≤OD≤18, WT/OD≤5% +22.5/-12.5
3≤OD≤18, WT/OD>5% +15.0/-12.5
OD≥20, WT/OD≤5% +22.5/-12.5
OD≥20, WT/OD>5% +15.0/-12.5


Product Display

seamless steel pipe (117)seamless steel pipe (134)


Packaging And Transportation


 steel (1)steel (4)steel0.7

steel (3)steel sm


 FAQ

1.Why you choose us?

Our company has been 12 years. We control the quality of the products very strictly, there are special people for the quality.

If you got lower price from other supplier, we will pay back twice to customers about the higher price.

 

2.How long is your delivery time?

According to the quantity. Generally within 2-7 days if in stock. And 15-20 days if not in stock.

 

3.What is your payment terms?

 A: By T/T 30% in advance, and 70% before delivery.

 B:100% L/C at sight.

 C:By T/T 30% in advance,and 70% L/C at sight.

 

4.Do you provide samples? Is it free?

Yes, we offer the sample for free but do not pay for the cost of freight.

 

5.What if the customer is not satisfied?

If there is a problem with the product, we take full responsibility. 

If there is a problem in the transportation process, we will help you to solve it.

Video
e5eb81ba8c2eb7d35577d99c3a11d501
Leave A Message
If you have questions or suggestions,please leave us a message,we will reply you as soon as we can!
-
Please fill in the information
*
Please fill in your e-mail
*
Please fill in the content
Send Inquiry
* Please fill in your e-mail
* Please fill in the content
Home> Products> Steel Pipe> Carbon steel pipe> S335 Carbon Steel Pipe
Send Inquiry
*
*

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send